Revasive for engineers

Physical version
control.

Store each phase as a spatial snapshot, then move through every revision in 3D. See components shift, cable paths develop, and the build converge over time.

RACK_02 / PHYSICAL BUILD LOG● 4 revisions synced
Revision 08 · July 12Network + power routing

Final cable paths documented after PDU relocation and switch install.

A commit history for the physical system

Inspect what changed,
not only what exists.

Photos flatten context and CAD stops at intent. One spatial snapshot preserves the assembled reality. A series lets anyone step through the build and understand how one revision became the next.

01

Scrub through revisions

Move from bare frame to current build while keeping the same spatial orientation.

02

Compare in context

See component placement, routing, access, and clearances as one connected system.

03

Bring others inside

Give remote collaborators the view they need without another call or photo hunt.

Build history, spatially aligned

Every revision remains inspectable.

Open any state, orbit the assembly, and move forward or backward through the project without losing your place.

REV 00
Bare frameMay 02
REV 03
ComputeMay 16
REV 06
PowerJune 08
REV 08
NetworkJuly 12 · current
REV _ _
Next captureNot yet recorded

Made for hardware that evolves

Prototypes

Keep every physical iteration, including the ones that did not ship.

Robotics

Track mechanisms, electronics, harnesses, and packaging together.

Infrastructure

Return to installation and routing decisions after the rack has filled in.

Custom fabrication

Preserve fit, assembly, and workholding context beyond the drawing.

Keep this assembled state

Capture it first.

One spatial snapshot is useful. The build history can grow later.

Take an engineering snapshot